nlmk steel


NLMK Steel Portage, Indiana

Tonn and Blank has been engaged with Beta Steel, now NLMK Indiana, since the late 80s, and has worked on multiple projects totaling more than $100 million dollars. The most recent project was a two-phase heavy industrial design/build project.


The two-phase heavy industrial design/build project included a hot strip mill, 350,000 square foot manufacturing facility, construction of mill foundations, Design/Build of main and mill offices, and all equipment installation. The second phase of the project was and electric mill shop consisting of a 150,000 square foot production facility, machine foundations, construction of supporting services (water treatment plant, pollution control equipment, alloy systems, railroad access), and all equipment installation.


Project Details
  • Ongoing projects since 1980s
  • Projects total more than $100 million
  • Design build multi-phase facility addition
Market
  • Industrial

Mainstreet Assisted Living – Symphony of Dyer Dyer, Indiana Previous Project
Olympic Steel Gary, Indiana Next Project